History and Development Trends
 
 
1993: Iranian Offshore Engineering and Construction Company (IOEC) is established as one of the first Iranian Offshore General Contractors.
1994: IOEC signs its first EPCI contract for the construction of offshore facilities of Abouzar oilfield in the Persian Gulf.
1999: Khoramshahr region is selected as the site for IOEC yards and concrete weight-coating (CWC) plant.
1999: IOEC starts installation of offshore structures with its Heavy Lift Crane vessel and three other Transportation barges.
2001: Acting as an EPCI contractor, IOEC wins various oil and gas projects.
2001: Abouzar 1200 mt crane barge is upgraded to a pipe-laying vessel.
2003: IOEC is awarded its first major international contract in India (RSPPM).
2004: The Management and Planning Organization of Iran (MPO) recognizes IOEC as a “Grade A” Contractor in the Field of Petroleum, Gas and Petrochemical Industries (Marine pipelaying and structures installations included).
2006: Moody International certifies IOEC with ISO 9001 (Quality Management System certification) in addition to ISO 14001 and OHSAS 18001:1999 Certificates.
2006: Iran-based Trade Promotion Organization (ITPO) selects IOEC as Iran’s “Exporter of the Year” in the field of engineering.
2007: RSPPM project in India is hooked up and handed over to the client (ONGC) with no major accident in 9.4 million working hours.
2009: IOEC is awarded its second international contract in India.
2010: IOEC is awarded its third international contract in India.
2010: IOEC achieves a record $7.5 billion for its ongoing projects.
2010: Pressure vessel and SPM manufacturing plant starts work in Khorramshahr Yard.
2010: The Geneva-based Business Initiative Directions (BID) once again awards IOEC the International Platinum Star for Quality.
2011: IOEC increases its capital from 866 billion Rials to 2000 billion Rials.
2013: Once again IOEC is ranked 61st among the top 100 Iranian companies by the Industrial Management Institute.
2014: IOEC conducts simultaneous implementation of South Pars projects, including load out, transport and installation of 5 decks, as well as commissioning and start up of various decks in South Pars phases, in addition to commissioning and start up of 7 pipelines.
2015: Once again IOEC re-enters international market with Iran-Oman pipeline.
2015: IOEC enters upstream sector directly through an EPD contract for SP phase 14 platforms B and D  