DR & Material Handling Project Ghaenat Steel Complex

Client Name   : NISC Location       : Ghaenat Start Date     : – Project Type: EPCI Status: Completed Facilities: Fab. & Installation: (800.000 Ton Plant) Included: Core Area Water System & Pump station Main Control & Electrical Area Natural Gas Reducing Station Material Handling Plant Buildings Photo:

Utility NGL Kharg

Client Name   : IRITEC Location       : 50 km from Asaluyeh, Tombaq Start Date     : – Project Type: EPCI Status: Completed Facilities: Generate of Utility Package for NGL Kharg Photo:

Labsefid Desalting & Dehydration

Client Name   : NISOC Location       : 60 km from Dezfoul – Labsefid Start Date     : – Project Type: EPCI Status: Completed Facilities: Desalting of 6 oil wells. Photo:

Pipeline from Abadan to Ahvaz (152 km)

Client Name   : NIORDC Location       : Khozestan-Iran Start Date     : – Project Type: EPCI Status: Completed Facilities: 152 km Pipeline– Transfer of Oil Products with Capacity 90,000 BOD and Maximum capacity 140,000 BOD from Abadan Refinery to Nezamieh, Ahwaz Photo:

Electricity & Steam Production for Ilam Petrochemical

Client Name   : ILPC Location       : Chovar – Ilam Start Date     : – Project Type: EPCI Status: Completed Facilities: 4 GTG System with Production Capacity:22,30 Megawatt 2 HRSG System for Steam Production 1 Boiler Set (40 Tone/H) Photo:

Gas Sweetening Project – Iran-LNG

Client Name   : ILC Location       : 50 km from Asaluyeh, Tombaq Start Date     : – Project Type: EPCI Status: Completed Facilities: Filtration and Sweetening 2000 MMSCFD Standard Gas. Photo:

Nar Gas Compressor Station

Client Name   : NISOC Location       : Nar-Kangan Start Date     : – Project Type: EPCI Status: Completed Facilities: 20 Inch Pipeline 24, 30 Inch Pipelines Photo:

Astinava Yard Project

Client Name   : PDVSA Location       : Venezuela Start Date     : 2010 Project Type: E Status: Completed Facilities: Feasibility Study & Conceptual Design for Construction of Astinava Yard Photo: