Re-entry of 2 wells in R1 and drilling of 2 new wells in R1 and 2 new wells in WHP1
Photo:
https://www.ioec.com/wp-content/uploads/2020/10/image-74.png203450babakmzhttps://www.ioec.com/wp-content/uploads/2021/01/IoecLogo.pngbabakmz2020-10-18 14:21:362020-10-18 14:21:38Resalat Oil Field Development – Phase 1 (EPC-EPC)
https://www.ioec.com/wp-content/uploads/2020/10/image-72.png234416babakmzhttps://www.ioec.com/wp-content/uploads/2021/01/IoecLogo.pngbabakmz2020-10-18 14:19:322020-10-18 14:19:34South Pars Gas Field Development (Phase 16 - Repair of 32 Inch Pipeline)
The project entails systems for measuring or metering crude oil, 6 series of seabed pipelines (Each 7 Km), and three SPMs & PLEM
42 km 36 inch Onshore & Offshore Pipelines
3 Set Pig Launcher/ Receiver
Project Manager: Ms. M.Jahangiri
Photos:
Trench operation: Special trenching vessel (Hirad)
25 January 2021 / Operation in dimensions of 2.5 km in length and 70 meters in width 25 January 2021 / C-Master vessel is laying the pipes (36″) along the way (7 km) after a successful shore pulling operation
12 February 2021 / The first SBM of Jask oil terminal was loaded
12 February 2021 / The SBM, submarine multi-lane, and accessories of the early part of Jask oil terminal project were loaded in Khorramshahr industrial yard.
The loading of SBM with its ancillary structures has been completed and after the end of the bracing operation, it will be transferred to the installation site in the waters of the Oman Sea in the coming days.
The transport capacity of crude oil, gas and condensate of this SBM is 7,000 cubic meters per hour (equivalent to one million barrels per day)
Soon, with the installation of this offshore structure at a distance of approximately 6 km from the shores of Mokran, the early part of Jask oil terminal will be put into operation and it will be possible to dock and transfer crude oil to export tankers in this terminal.
https://www.ioec.com/wp-content/uploads/2020/10/image-63.png186331babakmzhttps://www.ioec.com/wp-content/uploads/2021/01/IoecLogo.pngbabakmz2020-10-18 14:10:402020-10-18 14:10:41South Pars Gas Field Development (Phase 13A-Pipelines)
https://www.ioec.com/wp-content/uploads/2020/10/image-60.png206275babakmzhttps://www.ioec.com/wp-content/uploads/2021/01/IoecLogo.pngbabakmz2020-10-18 14:09:012020-10-18 14:09:02South Pars Gas Field Development (Phase 13B-Pipelines)
Location : Persian Gulf, 100 km Iranian south coast in Asaluyeh
Start Date : 15/06/2010
Project Type: EPCI
Status: Current
Facilities:
3 Jackets & Ancillaries
3 Topsides (SPD19A, SPD19B & SPD19C)
225 km 32” & 4” Export Pipelines (19A,19C)
13 km Infield Pipelines
6 km 36 ” SPM Pipeline
3 km Onshore Pipelines
5.33 km 19C-SPD2 & 7.94 km 19A-19B Cable
SPM
Photo:
https://www.ioec.com/wp-content/uploads/2020/10/image-59.png189336babakmzhttps://www.ioec.com/wp-content/uploads/2021/01/IoecLogo.pngbabakmz2020-10-18 14:06:542020-10-18 14:06:56South Pars Gas Field Development (Phase 19-Platforms & Pipelines)
Location : Persian Gulf, 100 km Iranian south coast in Asaluyeh
Start Date : 15/06/2010
Project Type: EPCI
Status: Current
Facilities:
22 Gas Wells (SPD14B & SPD14D)
Photo:
https://www.ioec.com/wp-content/uploads/2020/10/image-57.png189252babakmzhttps://www.ioec.com/wp-content/uploads/2021/01/IoecLogo.pngbabakmz2020-10-18 14:05:102020-10-18 14:07:12South Pars Gas Field Development (Phase 14 – Drilling)