Resalat Oil Field Development – Phase 1 (EPC-EPC)

Client Name   : IOOC

Location       : Persian Gulf

Start Date     : 13/06/2020

Project Type: EPCI

Status: Current

Facilities:

  • Project FEED, Data gathering, and Basic Engineering
  • WHP1 Platform including Jacket & Deck
  • Subsea Pipeline (10”, 3.6 km), Infield Pipeline & Required Risers On WHP1 & PP Platform
  • Subsea Composite Cable (3.6 km)
  • Development and renovation of Existing offshore complex
  • Final offshore commissioning ‐ Total integration
  • Jacket SMR (Strengthening, Modification & Repair) and Topside Inspection & Repair
  • Re-entry of 2 wells in R1 and drilling of 2 new wells in R1 and 2 new wells in WHP1

Photo:

South Pars Gas Field Development (Phase 16 – Repair of 32 Inch Pipeline)

Client Name   : POGC

Location       : Persian Gulf

Start Date     : 19/01/2020

Project Type: EPCI

Status: Current

Facilities:

  • Repair of 31.7 km 32 Inch Pipeline

Photo:

Project Name : Ganaveh-Kharg Pipeline survey and Engineering (Methanol II)

Client Name   : Kharg Petrochemical

Location       : Persian Gulf

Start Date     : 03/11/2019

Project Type: EPCI

Status: Current

Facilities:

  • Geotechnical & Geophysical Survey
  • Basic, Detail & Installation Engineering

Photo:

Jask Terminal & Marine Facilities

Client Name   : POGC

Location       : Oman Sea

Start Date     : 20/04/2020

Project Type: EPCI

Status: Current

Facilities:

  • The project entails systems for measuring or metering crude oil, 6 series of seabed pipelines (Each 7 Km), and three SPMs & PLEM
  • 42 km 36 inch Onshore & Offshore Pipelines
  • 3 Set Pig Launcher/ Receiver

Project Manager: Ms. M.Jahangiri

Photos:

Trench operation: Special trenching vessel (Hirad)

25 January 2021 / Operation in dimensions of 2.5 km in length and 70 meters in width
25 January 2021 / C-Master vessel is laying the pipes (36″) along the way (7 km) after a successful shore pulling operation

12 February 2021 / The first SBM of Jask oil terminal was loaded

12 February 2021 / The SBM, submarine multi-lane, and accessories of the early part of Jask oil terminal project were loaded in Khorramshahr industrial yard.

The loading of SBM with its ancillary structures has been completed and after the end of the bracing operation, it will be transferred to the installation site in the waters of the Oman Sea in the coming days.

The transport capacity of crude oil, gas and condensate of this SBM is 7,000 cubic meters per hour (equivalent to one million barrels per day)

Soon, with the installation of this offshore structure at a distance of approximately 6 km from the shores of Mokran, the early part of Jask oil terminal will be put into operation and it will be possible to dock and transfer crude oil to export tankers in this terminal.

SPD9 Wreck Removal and Commissioning

Client Name   : POGC

Location       : Persian Gulf

Start Date     : 13/07/2019

Project Type: IC

Status: Current

Facilities:

  • SPD9 Wreck Removal and Commissioning

Photo:

Kish-Gorzeh Pipe Laying & Cable Laying

Client Name   : POGC

Location       : Persian Gulf

Start Date     : 10/08/2018

Project Type: EPCIF

Status: Current

Facilities:

  • 18 km 32” & 4” Export Pipeline
  • 18 km Cable line

Photo:

South Pars Gas Field Development (Phase 13A-Pipelines)

Client Name   : SADRA

Location       : Persian Gulf

Start Date     : 19/02/2018

Project Type: CI

Status: Current

Facilities:

  • 87.51 km 32” & 4” Export Pipelines
  • 6.13 km 18” Infield Pipeline

Photo:

South Pars Gas Field Development (Phase 13B-Pipelines)

Client Name   : SADRA

Location       : Persian Gulf

Start Date     : 30/01/2017

Project Type: CI

Status: Current

Facilities:

  • 96.12 km 32” & 4” Export Pipelines
  • 5.34 km 18” Infield Pipeline

Photo:

South Pars Gas Field Development (Phase 19-Platforms & Pipelines)

Client Name   : POGC

Location       : Persian Gulf, 100 km Iranian south coast in Asaluyeh

Start Date     : 15/06/2010

Project Type: EPCI

Status: Current

Facilities:

  • 3 Jackets & Ancillaries
  • 3 Topsides (SPD19A, SPD19B & SPD19C)
  • 225 km 32” & 4” Export Pipelines (19A,19C)
  • 13 km Infield Pipelines
  • 6 km 36 ” SPM Pipeline
  • 3 km Onshore Pipelines
  • 5.33 km 19C-SPD2 & 7.94 km 19A-19B Cable
  • SPM

Photo:

South Pars Gas Field Development (Phase 14 – Drilling)

Client Name   : POGC

Location       : Persian Gulf, 100 km Iranian south coast in Asaluyeh

Start Date     : 15/06/2010

Project Type: EPCI

Status: Current

Facilities:

  • 22 Gas Wells (SPD14B & SPD14D)

Photo: